home *** CD-ROM | disk | FTP | other *** search
/ Libris Britannia 4 / science library(b).zip / science library(b) / PROGRAMM / DB_CLIPP / 0264.ZIP / DATASHTS.ARC / ESTMAT.ARC / ESTMAT
Text File  |  1986-06-12  |  4KB  |  55 lines

  1.                                                                              
  2.                         DATATRAK CONSTRUCTION SOFTWARE                       
  3.                         ESTMAT - ELECTRICAL ESTIMATING                       
  4.                                                                              
  5.           * Operates in a menu driven format which prompts the estimator     
  6.             for the necessary takeoff information                            
  7.                                                                              
  8.           * Patented length and count probes work in any engineering         
  9.             or architectural scale                                           
  10.                                                                              
  11.           * Produces a detailed audit trail documenting each item as it      
  12.             is taken off                                                     
  13.                                                                              
  14.           * Prints extended totals by type of material (category) and        
  15.             phase (division of work)                                         
  16.                                                                              
  17.           * 256 device assemblies allow device components (switches,         
  18.             boxes, plates, etc. to be taken off with a single key stroke     
  19.                                                                              
  20.           * Assemblies can be modified during takeoff to adjust for          
  21.             different conditions                                             
  22.                                                                              
  23.           * Five labor columns allow you to fine tune your labor alloca-     
  24.             tions while in takeoff                                           
  25.                                                                              
  26.           * By-products such as hangers, couplings, and connectors are       
  27.             automatically attached to conduit                                
  28.                                                                              
  29.           * 72 available phases provide maximum flexibility for job          
  30.             organization and costing                                         
  31.                                                                              
  32.           * Computerized price updating reduces time spent keeping           
  33.             material prices accurate                                         
  34.                                                                              
  35.           * Extends prices in seconds and generates a list of those items    
  36.             which are either Halted or Quoted                                
  37.                                                                              
  38.           * Flexible Bid Summary consolidates information from price         
  39.             extensions to fine tune your bid                                 
  40.                                                                              
  41.           * Interfaces with DataTrak's ConTrak II Job Cost program           
  42.                                                                              
  43.           * Efficiently handles bid alternates and change orders             
  44.                                                                              
  45.           * "Windows in" the material catalog for easy item look up          
  46.                                                                              
  47.                                                                              
  48.                              Selected Reports                                
  49.                                                                              
  50.           Detailed Audit Trail             Labor Totals by Category          
  51.           Material Totals By Phase         Labor Totals by Phase             
  52.           Material Totals By Category      Halted & Quoted Items             
  53.           Material Totals By Vendor        Labor Overhead Report             
  54.  
  55.